esolutuion PT completes 125 slabs construction in Rabia Community -Riyadh

Watch Video 

 esolution construction and Engineering awarded the construction of posttension slabs  by Al Rafal, the consultant requested a full structural design review on the project includes foundation and vertical elements, esolution construction and engineering completed the full design and review of the original design of the project in two weeks time, the project construction started slowely with traditional construction system using Ribbed slabs, the owner and the main contractor agreed to change the structural system of the project to meet the tide time frame of the project, esolution construction and Engineering team visited the project and agreed to construct a mockup teachs all sub contractors how to read the drawings and to be aware of their workscope, with 125 number of post tension slabs, the project compeleted in 10 months from day of esolution joined the project.

Photo shows Villa during construction 

Photo shows Completed villas

 

Photo shows esolution team during mockup construction

 For more information on our projects, contact us